The thickness of the finishing

The prepar mixture is distribut over the surface using squeegees or rules with a given gap corresponding to the requir layer thickness.

The standard thickness of the base layer varies from 10 to 20 mm,

depending on the purpose of the site and the expect loads. After the middle east mobile number list material has been distribut,

it is compact using special rollers or trowels

The thickness of  to remove air bubbles and achieve maximum coating density.

The base layer must harden completely

Before laying the finishing coating,

which usually takes from 12 to 24 hours at an air temperature of at least +15°C.

The top (finishing) layer is laid in a japan electronics show 2025: asia’s leading electronics technology event opens in tokyo on january 22 similar way,

but using a finer fraction of rubber crumb and an increas content of the binder. Layer is usually from 6 to 8 mm, which, in combination with the base layer,

provides the necessary shock-absorbing properties of the coating.

Particular attention is paid to the uniformity of the material application

The thickness of  to eliminate the formation of height differences and problem areas in terms of water drainage.

The final compaction is perform

Using special trowels with a Teflon coating, preventing the material from sticking to the tool. Complete curing of the top layer and mobile lead achievement of operational

The thickness of characteristics occurs within 24-48 hours, depending on the temperature and humidity.

The main stages of laying a self-leveling rubber coating include:

Applying markings and installing guide beacons to ensure a given coating thickness; Preparing a working mixture for the base layer in a special mixer; Spreading the base layer over the prepar base using squeegees or rules;

Compacting the base layer with rollers or trowels

A technological break for curing the base layer (12-24 hours); Preparing a working mixture for the finishing layer with the addition of pigments; Spreading the finishing layer over the base layer using special tools; Final compaction of the surface with Teflon trowels; A technological break for complete curing of the coating (24-48 hours).