The primer is appli in an even Layer using rollers
The drying time of the primer depends on the temperature indicators and humidity of the atmosphere and usually varies from 4 to 12 hours.
It is critically important to strictly america phone number list adhere to the manufacturer’s recommendations regarding
Layer using rollers the material consumption rate and application technology to achieve maximum efficiency.
Types of rubber coatings and their installation features
Today’s construction market offers several key types of rubber crumb coatings, each of which is characteriz by its own technological witness by guests including yu ze, vice president of picc group installation features and intend purpose.
Seamless pour rubber coating is form directly at the installation site by combining crush rubber crumb with a special polyurethane binder.
The main advantage of this type is its monolithic structure, which prevents atmospheric moisture from penetrating to the base and significantly increases the durability of the material.
The technological process of laying
The self-leveling coating requires high professional skills from the performers and strict adherence to proportions when mixing the components.
A characteristic feature of the installation mobile lead process is the ne to use highly specializ equipment for uniform distribution of the working mixture and its subsequent compaction using special trowels or mechaniz troweling units.
Factory-made roll rubber coating is present on the market in the form of ready-made elastic mats, manufactur in factories by pressing rubber crumb with a polymer binder.
The process of installing roll coating is characteriz
By comparative technological accessibility and high spe of work, which makes it an attractive solution for arranging large areas.
The technological algorithm includes precise cutting of the material in accordance with the overall dimensions of the site being arrang, reliable fixation using a profile adhesive composition and careful adjustment of the connecting seams to form a solid surface.
A critically important aspect is the preliminary acclimatization of the roll material for one or two days at a room temperature of at least +15°C before the start of installation work, which effectively minimizes the risk of deformation changes in the coating during further operation.